The Building
These pictures all have to do with construction that has taken place around the building. Below each picture is a small caption of what was happening at the time of construction. If you have pictures you would like to contribute to this page please e-mail them to: info@eastworks.com.


I-Beam construction with a wood roof is what this area is made out of. Here is one of lights hanging from the thick I-Beam roof.


This shot is a ramp that has been used for storage for a decade.


This is how much the cement wall shifted once the conveyor was removed. It use to sit flush with that I-beam.


Bottom leg of the conveyor support, badly cracked


A mess left behind, this entire wall (with the exception of the brick) is being removed.


The otherside of the loading dock. All being removed.


The front of the dock area. Scheduled for removal week of April 16th-23rd, 2007.

All pictures taken by Jennifer Bemben, the Eastworks Building Maintenance Supervisor, on April 13, 2007.